Export Vehicle Application Guide November 2024
NISSAN Y62 PATROL Fitting Time ARB ROOF RACKS FULL LENGTH (3800033M, 3727020) 2200x1350mm Deluxe steel with mesh floor 1.5 Hours (3800103, 3727020) 2200x1350mm Trade steel 1.5 Hours (3800103M, 3727020) 2200x1350mm Trade steel with mesh floor 1.5 Hours ROOF RACK ACCESSORIES (3500390) Double Jerry Can Holder 0.5 Hours (3700300) Trade Rack Roller Kit 0.25 Hours SAFARI SNORKEL (SS62HFS5) MY20 S5 08/19 On, 4.0Ltr V6 (OS Model) & 5.6Ltr V8, Petrol 4.5 Hours (SS62HF) 02/10 To 04/19, 4.0Ltr V6 & 5.6Ltr V8, Petrol 4.5 Hours OLD MAN EMU SUSPENSION PRODUCTS Please refer to the latest Old Man Emu Application Guide. ARB AIR LOCKER LOCKING DIFFERENTIALS & AIR COMPRESSORS Please refer to the current Air Locker application chart for part selection https://view.publitas.com/arb-4x4-accessories-1/air_locker_application_chart/page/1 ARB AIR COMPRESSOR ACCESSORIES (3527070) Air Compressor Bracket Kit for Nissan Patrol Y62 Suits CKSA,CKMA,CKMTA 4 Hours ARB LINX VEHICLE ACCESSORY INTERFACE AND COMPONENTS (LX100) Vehicle Accessory Interface (Includes LINX Display Screen, Controller & Gimble) 3 Hours (7450111) A-Pillar Mounting Bracket (Vehicle Specific) 0.5 Hours (7450107) Pressure Control Kit, Pressure Regulating Valve (PRV) 1 Hour 1 (7450124) Six Channel Fused Relay Box 1 Hour (7450116) LINX TPMS Comms. Box Bluetooth Module 0.5 Hours (SJBLINX) ARB Intensity Solis Patch 1 Hour (7450119) LINX Fuse Tap Pack of 2, 1 Micro Blade & 1 Mini Blade (7450118) LINX USB Extension Cable 3 Metre USB 3.0 1 Suggested fitting position of (7540124) Six-Channel Fused Relay Box where optioned is the LHS of the main battery tray, alternatively can be fitted beneath Outback Solutions Drawer where optioned. Please Refer To The Current LINX Website Prior To Appplication https://linx.arb.com.au/ CARGO BARRIERS (CBNPY62) Nissan Patrol 02/13 On 0.75 Hours OUTBACK SOLUTIONS MODULAR ROLLER DRAWER SYSTEMS -2013 on models DOUBLE 1 (RD1045 x 2) 2 Drawers 4.75 Hours RDRF1045, RFH1045) 1x Drawer With Roller Floor & 1x Mid Height Roller Floor 4.75 Hours (RDRF1045 x 2) 2 x Drawers With Roller Floors 4.75 Hours (RD1045, RFH1045) 1x Drawer & 1x Mid Height Roller Floor 4.75 Hours 1 (RDRF1045 x 2) 2 Drawers with roller floors 4.75 Hours (RD1045, RFH1045) 1xDrawer, 1x Mid Height Roller Floor 4.75 Hours 1 (RD1045, RDRF1045) 1 Drawer & 1 Drawer with roller floor 4.75 Hours 1,2 (RD1045, RF1045) 1 Drawer & 1 roller floor 4.75 Hours 1,2 (RDRF1045, RF1045) 1 Drawer with roller floor & 1 roller floor 4.75 Hours (RFH1045 x 2) 2x Mid Height Roller Floors 4.75 Hours (RF1045 x 2) 2 roller floors 4.75 Hours STACK 3 (RD845) 1 stacking drawer 3.75 Hours 3 (RD845 x 2) 2 stacking drawers 4.75 Hours 246
Made with FlippingBook
RkJQdWJsaXNoZXIy NDAxOTI=